The Start of Renovation
Before…
Before Renovation
It has to go!
During Renovation
Time for a change!
A Different Angle Before Renovation
Removed a protruding wall which served as a closet. Of course the back wall wasn’t level with the the adjoining wall. Had to build out the studs and re-drywall to make it even.
Another Look At The Bathroom
Tub day. It fits!
New Tub Installed
Went with a simple surround which works well here.
One Step Closer
Laid down Schluter Ditra membrane.
New Floors
Tile down. These were big but it went pretty fast.
Out With The Old In With The New
New window installed.
New Window Looking Wonderful
The cabinets and tub removed using saws, hammers, and pry bars.
Laying Tile
Wall tile. This took a while.
Coming Together Nicely
Tile in, need to grout.
Grout Is Complete
Grout done. Loving the look.
Beautiful Shelves
Built matching shelves in the new closet space. I used plywood as a base and attached “floating floor” material to them. This allowed me to use the matching wooden threshold as a faceplate. Wasn’t quick but certainly easier than with wood and trying to match the stain.
Last Electrical Steps
Final electrical move.
Look How Wonderful It Came Out
All done.